| 1 2 3 4 5 6 7 |
Search Results |
 |
1.0 MG Water Storage Tank
| Location: |
Snowmass Village, CO |
| Description: |
1 million gallon post-tension concrete water storage tank. |
| Built By: |
CFC/PCL |
| Delivery Method: |
[CMA] Construction Management - Agency |
|
|
 |
14th Street ICWW Bascule Bridge Rehab (Design/Build)
| Location: |
FL |
| Description: |
Structural Steel and Mechanical Rehabilitation |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
14th Street Overpass Sidewalk Rehabilitation
| Location: |
Calgary, AB |
| Description: |
Redevelopment of Existing Bridge Pedestrian Sidewalk |
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
 |
2007 Infrastructure Improvement Project GMP
| Location: |
Snowmass Village, CO |
| Description: |
Snowmelt addition and public roadway. |
| Built By: |
CFC/PCL |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
91st Ave WWTP Expansion UP01 Completion Project
| Location: |
Tolleson, AZ |
| Description: |
Construction of the 91st Avenue WWTP UP01 Expansion Completion Project. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
91st Ave WWTP Unified Plant Expansion 2005 - Project A Project No. WS90100079 (WS90100057)
| Location: |
Tolleson, AZ |
| Description: |
Transmit effluent water to the Tres Rios Wetlands project and to the ANPP Transmission line. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
91st Avenue WWTP Chlorination Facility & Effluent Channel Impr.
| Location: |
Phoenix, AZ |
| Description: |
Chlorine contact basin and associated systems |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Albuquerque Water Treatment Plant
| Location: |
Albuquerque, NM |
| Description: |
New water treatment plant |
| Built By: |
PCL/Triad Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Alex Fraser Bridge to Annacis Island
| Location: |
Vancouver, BC |
| Description: |
Cable-stayed Bridge
|
| Built By: |
PCL-Pashen-Pike |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Anthony Henday Drive and Stony Plain Road (100 Avenue) Interchange
| Location: |
Edmonton, AB |
| Description: |
Interchange - road work and bridge |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Anthony Henday Drive Southeast Leg Ring Road
| Location: |
Edmonton, AB |
| Description: |
Ring Road and bridges (P3) |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[P3 (DBFO)] P3 Design Build Finance Operate |
|
|
 |
Arrowhead Ranch Water Reclamation Facility Expansion Capacity
| Location: |
Glendale, AZ |
| Description: |
Sewage Treatment Facility Expansion
|
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Avondale WRF Improvements
| Location: |
Avondale, AZ |
| Description: |
Improvements and Expansion at the Avondale WRF. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Avondale WWTP Dewatering Equipment & Solids Handling Facilities
| Location: |
Avondale, AZ |
| Description: |
Construction of a Feed Pump Station, Solids Handling Facility and other miscellaneous work. |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Ballard (Civic) Municipal Center Park Development - Phase II Construction
| Location: |
Seattle, WA |
| Description: |
Ballard Park Development |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Ben Sawyer Swing Bridge Design-Build
| Location: |
Charleston, SC |
| Description: |
Superstructure replacement of the Ben Sawyer Swing Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Bridgeview Pump Station
| Location: |
Surrey, BC |
| Description: |
Sewer system upgrade and replacement of existing pump station |
| Built By: |
PCL Constructors Westcoast Inc. |
|
|
|
|
 |
Central Link Light Rail C755
| Location: |
Tukwila, WA |
| Description: |
Light Rail and Station |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Centre Street Bridge Rehabilitation
| Location: |
Calgary, AB |
| Description: |
Rehabilitation of Historic Bridge over Bow River |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Chesapeake Bay Bridge
| Location: |
Virginia Beach, VA |
| Description: |
12 miles of low level bridge and two high level bridges
|
| Built By: |
PCL/Hardaway/Interbeton, A Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
| |
| 1 2 3 4 5 6 7 |